Full Control. Full Visibility. No More Blind Negotiation.
From RFQ to the end of the supplier relationship — manage every cost driver, track every price movement, and maintain competitive advantage in a fair and transparent way.
1
Should Cost
Build product cost models from BOM before negotiation. Set the right target price from the start.
RFQ Stage
2
Cost Change Calculator
Track vendor cost changes with 350+ commodity indexes. Automatic impact calculations for fair negotiations.
Post-RFQ Cost Management
3
CIFA Forecast
Commodity Intelligence Forecast Agent
AI-powered price forecasts for 37 commodities. Set budgets and decide optimal order timing.
Strategic Planning
Where do you want to start?
Choose a tool to get started.
Should Cost
RFQ Stage
Build product cost models from BOM before negotiation. Set the right target price from the start.
Cost Change Calculator
Post-RFQ Cost Management
Track vendor cost changes with 350+ commodity indexes. Automatic impact calculations for fair negotiations.
CIFA Forecast
Commodity Intelligence Forecast Agent
Strategic Planning
AI-powered price forecasts for 37 commodities. Set budgets and decide optimal order timing.
Built for Procurement Teams
Buyers
Build should-cost models before RFQs. Track vendor cost drivers. Use simulator mode to prepare negotiation scenarios.
Costing Engineers
Validate cost breakdowns, verify weights and indexes, ensure data accuracy before calculations go to management.
Procurement Managers
See all vendors at a glance. Approve cost change requests. Track total impact across your portfolio with one click.
Finance & Leadership
Defensible forecasts for budgeting. Transparent cost change data for board reporting. Evidence-based savings targets.
385
Commodity Indexes
37
AI Forecasts
12
Countries
3
User Roles
Stop negotiating in the dark.
Full control over your procurement costs — from the first RFQ to the last invoice. Fair, transparent, data-driven.
Pricing
Monthly billing · Cancel anytime · Bundle all 3 and save 15%
CIFA Forecast
AI-powered commodity price forecasts across 37 commodities
Select a commodity to generate a comprehensive price forecast.
📄 Your Reports (0)
📊
No reports yet. Generate your first AI forecast above!
Commodity Indexes
350+ commodity indexes with month-on-month and year-on-year changes. Click any row for a 5-year chart.
Loading...
How to use — Should Cost
Should Cost builds a target price for a product from the ground up. Describe the part; the tool calculates what it should cost using built-in regional machine, labour and overhead rates for 12 countries and 20 manufacturing processes.
Required inputs
Material — Material type and weight (g or kg). The tool adds the scrap allowance from the selected process.
Manufacturing process — Sets the machine hourly rate and the tooling cost range.
Cycle time (seconds) — The most cost-sensitive input. If unknown, leave the default — it is loaded from the process automatically.
Assembly time (minutes) — Labour minutes for handling, inspection and packing of one part.
Manufactured vs Purchased
Manufactured — The part is produced. Fill material, weight, process, cycle time, tooling and assembly minutes.
Purchased — The part is bought ready. Enter only the unit purchase price; the other fields are disabled.
Tooling or consumable?
Apply one test: “Would this object still exist if my specific part were never ordered?”
No → Dedicated tooling. Enter the total tool cost; the tool amortises it across the annual volume.
Yes → Consumable (cutting tip, lubricant, standard die). Do not enter it here — it is already included in the machine hourly rate.
Finding cycle time — four sources
Supplier RFQ — ask “Seconds per part?” as a standard question.
Built-in default — loaded automatically when the process is selected.
Similar part benchmark — use a part of comparable weight and process you have bought before.
Factory observation — one minute with a stopwatch on site is enough.
Product Configuration
Bill of Materials
Part Name
Type
Material
Weight (kg)
Qty
Process
Cycle (s)
Tooling ($)
Assy (min)
Purch. ($)
Pre-filled with region defaults. Edit to override for this product.
Cost Breakdown
Add parts to the BOM to see cost breakdown.
Saved Products
No saved products yet.
Cost Change Calculator
Buyer level, vendor level Cost Change Calculation based on last price agreement date.
Monthly Updates — Cost price risks & opportunities updated on the 22nd of each month.